Environmental permit
The environmental permit is in Swedish
Technical reports
2020
Whittle Consulting Enterprise Optimisation Report, Executive Summary
2019
Golder, Executive Summary, Blötberget Feasibility report
SRK, Väsman project conceptual study results
2018
CPR Blötberget_2018
CPR Väsman & Håksberg 2018
2017
Mineral Resource Estimate, update 2017
2016
SGA report on laboratory and pilot scale testwork on 8 t ore sample from Blötberget
2015
GTK Report Variability Testwork Draft v3 2015-12-01 (Eng)
GTK Report Pilot Plant v12 2015-12-01 (Eng)
GTK Report Initial Testwork Draft Report v2 2015-12-01 (Eng)
Blötberget Iron Ore Project – From Resource and Mining History to Present 2015-12-01 (Eng)
Analysis of selected drill core samples from Blötberget and Håksberg. 2015-12-01 (Eng)
21st_Iron_Ore_Symposium June (Eng)
Appendices-A_K-Updated April (Eng)
DMT Consulting Ltd, Mineral Resource Estimate for Blötberget Iron Ore Projekt 2015-04-10 (Eng)
C22-R-124 Blotberget Final Interim Report R0 April (Eng)
2014
SRK Ludvika DFS Gap Analysis Report June (Eng)
Company presentation April (Eng)
Geovista, Technical Report – Blötberget – Mineral Resource Estimate 2014-01-25 (Eng)
2013
Presentation Mining on Top. November (Eng)
Presentation Informa 8th EU Iron Ore October (Eng)
Geovista, Ludvika Mines – Mineral resource update. 13-01-10 (Eng)
2012
Invest Sweden – London December (Eng)
SBB Steel Raw Materials Amsterdam September (Eng)
2011
Ramboll PEA December (Eng)
8th annual exploration & mining investment conference 2011 (Eng)
Geovista, Magnetisk Modellering – grundläggande begrepp. 11-11-25 (Eng)
Geovista, Teknisk rapport, Väsman. 11-10-07 (Eng)
Geovista, Verifiering av mineralresurser, Blötberget & Håksberg. 11-08-31 (Eng)
Exploration permits
Nordic Iron Ore has an exploration permit covering an area relevant for the Ludvika Mines project and connecting the mining concessions.
There is also one permit covering an area adjacent to the conession for Blötberget that has been identifyed as potentially interesting during reseach studies.
Mining concessions
The company has been granted Four mining concessions – two in Blötberget, one in Håksberg and one for the southern part of the Väsman field.
Blötberget
Nordic Iron Ore applied for a mining license in October 2010 and August 30, 2011 was granted an application by the Mining Inspectorate of Sweden. An extension area was approved August 2017. The mining concessions, which runs for 25 years with possibility of extension, implies the right of exploitation and utilization of iron, rare earths, and apatite.
Håksberg
Nordic Iron Ore applied for a mining concession for the Håksberg field in March 2011 and the Mining Inspectorate of Sweden granted this on 15 December 2011. The mining concession, which runs for 25 years with possibility of extension, implies the right of exploitation and utilization of iron, molybdenum, copper and tungsten.
South Väsman
Nordic Iron Ore applied for a mining concession for the South Väsman field in May 2015 and the Mining Inspectorate of Sweden granted this on 21 December 2017. The mining concession, which runs for 25 years with possibility of extension, implies the right of exploitation and utilization of iron.
Methodes & processes
Nordic Iron Ore intends to work with all stages of the mine development process, from exploration to production. The mine development process generally consists of four components: permits, prospecting and exploration, evaluation and project planning and construction.