Technical reports

2020

Whittle Consulting Enterprise Optimisation Report, Executive Summary

2019

Golder, Executive Summary, Blötberget Feasibility report

SRK, Väsman project conceptual study results

2018

CPR Blötberget_2018
CPR Väsman & Håksberg 2018

2017

Mineral Resource Estimate, update 2017

2016

SGA report on laboratory and pilot scale testwork on 8 t ore sample from Blötberget

2015

GTK Report Variability Testwork Draft v3 2015-12-01 (Eng)
GTK Report Pilot Plant v12 2015-12-01 (Eng)
GTK Report Initial Testwork Draft Report v2 2015-12-01 (Eng)
Blötberget Iron Ore Project – From Resource and Mining History to Present 2015-12-01 (Eng)
Analysis of selected drill core samples from Blötberget and Håksberg. 2015-12-01 (Eng)
21st_Iron_Ore_Symposium June (Eng)
Appendices-A_K-Updated April (Eng)
DMT Consulting Ltd, Mineral Resource Estimate for Blötberget Iron Ore Projekt 2015-04-10 (Eng)
C22-R-124 Blotberget Final Interim Report R0 April (Eng)

2014

SRK Ludvika DFS Gap Analysis Report June (Eng)
Company presentation April (Eng)
Geovista, Technical Report – Blötberget – Mineral Resource Estimate 2014-01-25 (Eng)

2013

Presentation Mining on Top. November (Eng)
Presentation Informa 8th EU Iron Ore October (Eng)
Geovista, Ludvika Mines – Mineral resource update. 13-01-10 (Eng)

2012

Invest Sweden – London December (Eng)
SBB Steel Raw Materials Amsterdam September (Eng)
2011
Ramboll PEA December (Eng)
8th annual exploration & mining investment conference 2011 (Eng)
Geovista, Magnetisk Modellering – grundläggande begrepp. 11-11-25 (Eng)
Geovista, Teknisk rapport, Väsman. 11-10-07 (Eng)
Geovista, Verifiering av mineralresurser, Blötberget & Håksberg. 11-08-31 (Eng)

Technical reports